Qingdao Top Run International Trade Co.,Ltd.

  • XCMG excavator undercarriage parts send to Zambia

    Today, we load one 20FT container for XCMG excavator undercarriage Parts, which include the track roller, idler roller, track shoe assy. These parts are ordered by a Zambia customer. Because they are very heavy, we have to hold them with a small container. Even so, the weight still reach the top limit. Wish the ship will arrive at the customer place as soon as possible.

    December 10, 2024
  • WD615 engine assy send to Kazakhstan

    Our Kazakhstan has ordered 12 pcs WD615 engine assy for his truck fleet in mine area. It is the first time for him to work with us. He has a truck fleet with more than 2000 trucks working in the mining area. He wants to buy some cheaper price but reliable quality engines to serve on his trucks. After we quote prices, and showing some photos and parameters of our engine, he decied to place a trial order to test. For the first trial order, he only ordered 12 pcs. If our engine quality can reach his expectation, there will be huge order in the future. We are very confident about our quality. It is no doubt we will have more orders from him. The engines are loaded by a 40 HC container, and send to him by railway. Hope he can receive these engines as soon as possible.

    December 08, 2024
  • Xcmg truck crane parts send to Saudi Arab

    Our Saudi Arabian customer has ordered one container XCMG truck crane parts in November, 2024. We prepared and packed all the parts in about 15 days. In order to catch the lattest ship, we send all the parts into Qingdao port by a truck at night, because the customer's stock will be empety soon, so he needs the parts urgently. Qingdao port is beside our warehouse. The truck can arrive at the port in about 10 minitues. Our business principle is to provide the best service to customers. We are always trying to keep this to be a reliable partner in China. Welcome more customers to work with us!

    December 08, 2024
  • Pakistan customer visiting

    Today, we have customers from Pakistan come to visit us. Before his coming, we already have some cooperation on XCMG machines parts, but the orders are not very big. Now, they come to meet us, and want to enlarge the cooperation on bigger orders. We have a good talking, and the customer would place more orders to us. Wish a good cooperation for both sides.

    December 03, 2024
  • Attending the Bauma China 2024

    From Nov.26 to Nov.29, the 2024 Bauma Fair show is hold in Pudong, Shanghai. Our company staff pay a visit there. Basically, all the famous China construction machinery factory has made a big show there, such as XCMG, SANY, ZOOMLION, SDLG, LOVOL, WEICHAI,SHANTUI etc. A lot of machines with different funstions were shown, and more than 40000 visitors from china and other countries crowding to shanghai to take part in the exhibition. We have met and talked with many of our partner suppliers and foreign customers. After the exibition, we also have a good tour to visit some beatiful places, and enjoy the local delicious food. It is a good trip, we have learnt a lot and make good harvest.

    November 30, 2024
  • Shantui and XCMG parts send to Russia by truck

    Today, we have loaded one full truck shantui dozer parts and XCMG wheel loader parts for our Russia customer. The truck will carry these parts to Alashankoy at first. After finishing the export CUSTOMS clearance there, these parts will be sent to customer directly by a truck. This is much more faster and convinient than ship and railway. Hope the truck will arrive at the customer warehouse quickly.

    November 23, 2024
0

+86-186 6160 7809

skype:

+86-186 6160 7809

Jack@toprunsparepart.com